Services Provided: Geotechnical, Geophysical and Geological Engineering
Construction project in Istanbul: A Block with 8 basement floors, a ground floor, and 19 standard floors. For the investigation area, between September 29 and November 24, 69 boreholes were drilled using 4 drilling machines, reaching depths of 10.0 to 43.0 meters, with a total drilling length of 1,552 meters. Geophysical measurements included seismic measurements along 25 profiles, 2 resistivity measurements, and 6 microtremor measurements.